81.6kWp Grid-Tie PV Solar System
Location: Bel Air
Surface Area: m2
Year Complete: 2022
Green Power Solutions Inc. spearheaded the end-to-end process of designing, supplying, installing, and commissioning an impressive 81.6kWp Grid-Tie PV Solar System at the Shell Bel Air Service Station, showcasing a commitment to sustainable energy solutions.
The system boasts 204 400W Solar Panels and 6 Fronius Symo 12.0-3 208-240 Grid Tie Inverters, integrated to optimize energy production. These equipment warranties range from 10 to 25 years, with options for extended coverage at an additional cost, ensuring long-term reliability and customer satisfaction.
Online monitoring capabilities through Fronius and eGauge systems ensure real-time tracking of system performance, while comprehensive installation warranties provide peace of mind.
The client has embraced GPL's netbilling program, enabling excess solar power to be seamlessly sent to the grid and credited back, demonstrating a dedication to renewable energy.
Both SOL Petroleum and Green Power Solutions Inc. prioritize environmental responsibility, striving for a greener future.