22.8 kwp PV Grid-Tie Solar System

  • Client:
  • Location: 15 Strand New Amsterdam Berbice, Guyana
  • Surface Area: m2
  • Year Complete: 2019
  • Value: $
  • Supervising Engineer:

Green Power Solutions Inc. designed, supplied, installed and commissioned this 22.8 kWp PV Grid-Tie Solar System at 15 strand New Amsterdam Berbice, Guyana. This system was installed to reduce their monthly electricity cost and improve services.